← Home
Poka-Yoke Lab · Operations

How the lab runs

Since November 2026 the lab runs like a small production line. Work in progress has a hard limit, new work is pulled only when capacity frees up, and defects are caught on the card before anything moves. The methods come straight from the kanban and just-in-time production I study in industrial engineering.

WIP limit: 3 Pull, not push Defects caught at the source Weekly review on cycle time
01

Why the lab runs this way

I kept starting new projects and postponing old ones. A factory would call that overproduction: half-finished work piles up as inventory, it ties up capacity, and nothing ships. A research practice has the same failure mode, only the inventory is drafts and half-built experiments.

So I treat the lab as a production system. In November I cut the board from about ten candidate projects to four, keeping only work that moves my AI-security research forward. Everything else was parked or archived, with the reason written down.

Little's Law ties the rules below together: average cycle time equals work in progress divided by throughput. Capping work in progress is the one lever that shortens cycle time without adding hours, which matters when the lab only gets the time left over after coursework, research and an internship.

Want to see how this works week to week? Email hello@pokayokelab.org for a walkthrough.

02

The rules, and the industrial engineering behind each

Every rule exists to make a mistake impossible or impossible to miss, which is what poka-yoke means. The board can't physically stop me from breaking a rule, so each one is built to show the violation the moment it happens.

A hard limit on work in progress
At most 3 projects in progress, exactly 1 actively worked on, and at most 4 across Ready and In progress. Blocked projects still count, because blocked work is still inventory.Kanban WIP limit, with the Ready queue capped the way a supermarket buffer is sized.
Pull, not push
A project moves from Ready into progress only when an active project is finished.The pull signal of just-in-time: downstream capacity, not enthusiasm, starts work.
Ready means ready
Every active project has a next action under 2 hours, a "done when" that another person could check (a live URL, a published file, a sign-off), and a link to my career focus.Clear entry criteria, so nothing starts vague and nothing finishes by opinion.
Defects show on the card
A missing field or date flags the card, and nothing new is pulled until every flag is cleared.Poka-yoke as detection at the source, and zero defects before a pull.
Blocked work stays visible
A project waiting on someone else is marked blocked, stays on the board and still counts against the limit.Andon: stopping the line is fine, hiding the stop is not.
A resume note before every switch
Before switching projects I write down where I stopped and what comes next.SMED: prepare the changeover before stopping, so restarting is fast.
Flow is measured
Cycle time and weekly throughput are tracked, and the weekly review runs on them.Little's Law: cycle time = WIP ÷ throughput.
Ideas wait in a parking lot
New ideas go to a parking lot, not the board. At most one is promoted per week, at a 10-minute Sunday review, and only if it ties to my career focus.A stage-gate review instead of starting whatever is newest.
Committed work comes first
Coursework, university research and internship work sit off the board and get capacity first. The lab gets the slack.Load the fixed demand first, then plan against the capacity that's left.
Archive, never delete
Cut projects are archived with a reason.The record of what was cut, and why, is evidence the limit is real.

Running a lab or team that could use the same system? Email hello@pokayokelab.org to compare notes or collaborate.

03

The board right now

A public snapshot of the lab's kanban board as of November 2026. Details stay private; the shape of the work is the point.

In progress 3 / 3 Actively worked 1 / 1 Ready + in progress 4 / 4

NowIn progress · 3

Current focus

Poka-Yoke Lab website launch

This site: the place every other writeup publishes to.

In progress

Clinic Assistant security writeup

The security writeup of my hackathon project, a local-model clinic assistant with prompt-injection defenses, mapped to the OWASP Top 10 for Agentic Applications.

Blocked · waiting on approval to publish

Private writeup

Details stay private until the work is finished and cleared for release. It still counts against the limit while it waits.

NextReady · 1

Pulled when a slot frees

Agentic security eval v1

Scans of locally served models on my own hardware with NVIDIA's garak, with the failures ranked by FMEA.

ParkedParking lot

Eval v2

A cross-model comparison, plus a measurement-system study (Gage R&R) of the eval itself.

An education platform

An HTML5 game

Promoted one at a time, at the Sunday review, only if they tie to the focus.

ArchivedCut on purpose

A fintech dashboard

A game-show prediction model

Cut because they didn't serve the focus. Keeping them visible is the proof that the limit is real.

Want the details behind any card, or a walkthrough of the board? Email hello@pokayokelab.org.